The design and construction of a bridge across river kaduna in shirio l.g.a in niger state.(2013)
The design and construction of a bridge across river kaduna in shirio l.g.a in niger state.(2013)

The Construction of Shiroro Bridge Across River Kaduna in Niger State was funded by Niger State Government amounting US$16 million and completed in 2014, which had ended the travel history of ferry-crossing only and significantly improved the access to each side of the river. The project had been classed as a key people benefited project in both Niger State and Federal Level, earning the company’s award of Nigeria Engineering Excellent Design.

The contract amount is about16,500.000.00dollars
Design and Construction of Ningi-Burra Road in Bauchi State.(2008)
Design and Construction of Ningi-Burra Road in Bauchi State.(2008)

The Construction of Ningi-Burra Road in Bauchi State, was funded by Bauchi State Government amounting US$44.5 million, with a total distance of 113 km connecting from Ningi Town to Burra Town, which is the sole access for both towns to communicate with others, ending the towns’access history of no modern highway.

The contract amount is about44,500,000.00dollars
Construction of Anka,Gumi,Bukkuyum,nasarawa LGA Township Roads, Zamfara State(2012)
Construction of Anka,Gumi,Bukkuyum,nasarawa LGA Township Roads, Zamfara State(2012)

The Construction of Township Roads in ANKA, GUMI, BUKKUYUM AND NASARAWA Town in Zamfara State, funded by Zamfara State Government in 2012 amounting US$57 million, were asphalt concrete wearing modern highways with total distance of 60km, with completion of which in 2015 had tremendously relieved the traffic difficulties of the town people.

The contract amount is about57,000,000.00dollars
Construction of new water supply scheme, using underground water with total capacity of40 mgc., sokoto state
Construction of new water supply scheme, using underground water with total capacity of40 mgc., sokoto state

The Expansion of Water Supply Using Ground Water for Sokoto Metropolis and Its environs in Sokoto State, was funded by Sokoto State Government in 2014 amounting US$35 million, targeting to solve portable water problem in the southern metropolis and improve people’s living quality once project being completed.  

The contract amount is about35,000,000.00dollars